A Canadian company · Saint-Jean-sur-Richelieu, Québec, Canadainfo@nordtekfilms.com
NORDTEK Paint Protection Film
ENFRES
Become a partner

Technology · NORDTEK

What the film is held to.

The construction of NORDTEK film, the thresholds it is accepted against and what each of them means on a car. Thresholds are published here; measured values go to partners with the technical list.


01 — Construction

Four layers, one skin.

Illustration: three layers of film drawn apart above the front wing of a dark grey car, the lowest one with a satin haze.
  1. 01

    Topcoat

    A thin elastomeric coating. It carries the gloss or the satin, and it is what meets the wash brush, bug residue and the swirl marks from a bad towel.

  2. 02

    Aliphatic TPU

    The body of the film and the bulk of its thickness: the layer that stands between the road and the paint. Resists yellowing by its chemistry rather than by an additive.

  3. 03

    Adhesive

    A pressure-sensitive layer that wets out across the clearcoat over the first hours after installation. It also decides how cleanly the film comes off when it is removed.

  4. 04

    Paint

    What all of it is for. The film is chosen, applied and eventually replaced so the paint underneath is never the thing being repaired.


02 — What the thresholds mean

A minimum, not a best result.

A threshold is the line a material has to clear to be accepted. It is not the best value a lab once measured.

  1. Gauge · KLAR7.5 mil nominal

    Gauge is the thickness of the film, in thousandths of an inch. The figure given is nominal and for the clear gloss film; the matte and black films have their own, given with the technical list.

  2. UV blocking · gloss filmsNot less than 90%

    Ultraviolet is what ages clearcoat and fades colour. The gloss films hold back at least nine tenths of it before it reaches the paint. Not measured for the matte films.

  3. TPU stockAliphatic, yellowing-resistant

    Aromatic polyurethane turns yellow in sunlight. The aliphatic kind resists it far longer, which keeps a clear film over white paint from turning the car cream.

  4. Heat–frost cycleOn file

    Samples are cycled from heat to frost and back, again and again. On file: no cracking, clouding, blistering or colour change.

  5. Tensile strengthAbove 15 MPa

    The force the film takes before it tears. It matters when the film is pulled over a curve in the bay and again when it is taken off.

  6. ElongationNot less than 150%

    How far the film stretches before it breaks: to at least two and a half times its original length. That is the margin an installer works in on bumpers, mirror caps and deep curves.


03 — The topcoat

Light scratches close with warmth.

Fine marks from washing sit in the topcoat, not in the paint. With warmth they close again: sun on the panel, a rinse with warm water, a heat gun in the bay.

Deeper damage is a different matter. A cut through the film is not something warmth closes: the film on that panel is replaced.


04 — Four finishes

What is on file, film by film.

Each mark stands on a test report on file. KLAR and DIMMA are the clear films, SVART and NATT the same material in black; the black films’ values are released to partners on request.

NORDTEK · Technical summaryThresholds only
ConditionKLARDIMMASVARTNATT
UV blocking●·●·
Yellowing-resistant stock●●●●
Heat–frost cycle●●●●
Light scratches close with warmth●●●●
Tensile strength and elongation●●●●

● — test report on file· — not measured for matte

Thresholds, not measured values. The full technical list is provided to partners under NDA.


05 — What partners receive

The rest is in the technical list.

  1. 01

    Measured values

    The numbers behind every threshold on this page, film by film.

  2. 02

    Gauges and roll formats

    Thickness and roll sizes for each of the four films.

  3. 03

    Handling notes

    Stretch, post-heat and removal guidance for the bay.

  4. 04

    Care and warranty

    Care instructions for the customer, the owner warranty terms, and the partner terms set in the supply agreement.

The technical list is sent under NDA once an application is qualified.

Prefer to write?WhatsAppTelegramEmail